{"id":5882,"date":"2023-06-12T07:42:00","date_gmt":"2023-06-12T05:42:00","guid":{"rendered":"https:\/\/bachy-soletanche.com.sg\/?post_type=avada_portfolio&p=5882"},"modified":"2023-12-07T09:52:07","modified_gmt":"2023-12-07T08:52:07","slug":"t228-gardens-by-the-bay-station","status":"publish","type":"avada_portfolio","link":"https:\/\/bachy-soletanche.com.sg\/offer-portfolio\/t228-gardens-by-the-bay-station\/","title":{"rendered":"T228 Gardens by the bay station"},"content":{"rendered":"
Bachy Soletanche Singapore scope of work for contract T228 involves the construction of an underground station, an underground Pedestrian subway, one Tunnel Boring Machine<\/a> (TBM) launch shaft structure, one combined escape shaft, and a TBM retrieval shaft, twin bored tunnels, and associated utility and traffic diversions.<\/span><\/p>\n<\/div> Diaphragm Wall:<\/strong> 900m, 0.8-1.2m thick, average depth 36m to 60m. Excavation:34,610m3, concrete: 34,295m3<\/span><\/p>\n Sheet Piles:<\/strong> Hat Pile system adopted as removable ERSS. 365m; average depth 21m<\/span><\/p>\n Bored Piles:<\/strong> 310nos, 1.5m-2.5mdia, depth 49m; max 80m, Excavation :62,232m3,concrete: 41,250m<\/span><\/p>\n Soil Improvement:<\/strong> 7m, 15m & 18m thick treatment, DSM Treatment Volume: 132,568m3<\/span><\/p>\n<\/div> Owner:<\/span><\/p>\n Engineer:<\/span><\/p>\n General Contractor:<\/span><\/p>\n Year:<\/span><\/p>\n Related projects<\/span><\/p><\/h2><\/div>Project Information<\/span>\u00a0<\/span><\/h2>\n<\/div>
Land Transport Authority<\/span><\/h3>\n<\/div>
Arup Singapore Pte Ltd.<\/span><\/strong><\/h3>\n<\/div>
Nishimatsu – Bachy JV<\/span><\/h3>\n<\/div>
2014; 2020<\/span><\/strong><\/h3>\n<\/div>