{"id":5889,"date":"2023-06-12T08:40:55","date_gmt":"2023-06-12T06:40:55","guid":{"rendered":"https:\/\/bachy-soletanche.com.sg\/?post_type=avada_portfolio&p=5889"},"modified":"2023-12-07T10:00:31","modified_gmt":"2023-12-07T09:00:31","slug":"national-art-gallery","status":"publish","type":"avada_portfolio","link":"https:\/\/bachy-soletanche.com.sg\/offer-portfolio\/national-art-gallery\/","title":{"rendered":"National Gallery Singapore"},"content":{"rendered":"
The National Gallery Singapore project consists of the renovation of two historical buildings of Singapore<\/span>: Former City Hall and Former Supreme Court. A diaphragm wall<\/a><\/strong> has been designed in and out of the buildings in <\/span>order to build one to three basements below the existing buildings, of which the facades are preserved.<\/span><\/p>\n<\/div> 1) Cross the historical facades at 4 locations<\/span> Owner:<\/span><\/p>\n Engineer:<\/span><\/p>\n General Contractor:<\/span><\/p>\n Year:<\/span><\/p>\nProject Challenges<\/span><\/h2>\n<\/div>
\n2) Work within Former Supreme Court under a limited headroom of 5.3 to 6.5m high<\/span>
\n3) High steel ratio: average of 288 kg\/m3 and up to 420 kg\/m3<\/span>
\n4) Work in adjoining streets within 8.5m width<\/span><\/p>\n<\/div>National Heritage Board, Singapore<\/span><\/h3>\n<\/div>
CPG Consultants Pte Ltd<\/span><\/h3>\n<\/div>
Takenaka -Singapore Piling Joint Venture<\/span><\/h3>\n<\/div>
2011; 2013<\/span><\/h3>\n<\/div>