{"id":5919,"date":"2023-06-12T10:24:06","date_gmt":"2023-06-12T08:24:06","guid":{"rendered":"https:\/\/bachy-soletanche.com.sg\/?post_type=avada_portfolio&p=5919"},"modified":"2023-12-07T10:18:51","modified_gmt":"2023-12-07T09:18:51","slug":"farrer-road-station","status":"publish","type":"avada_portfolio","link":"https:\/\/bachy-soletanche.com.sg\/offer-portfolio\/farrer-road-station\/","title":{"rendered":"C854 Farrer Road Station"},"content":{"rendered":"

We Build the Foundation of Smart Cities<\/span><\/h1>\n<\/div>
<\/div><\/div><\/div><\/div><\/div><\/div>\n

C854 Farrer Road Station<\/span><\/h2>\n<\/div><\/div><\/div><\/div><\/div>

Project Description<\/span><\/h2>\n<\/div>
<\/div>\n

The Circle Line is a 33km extension to the Singapore mass transit system comprising 29 stations. Contract C854 involves the construction of a station at Farrer Road and cut and cover tunnels including receiving shafts for Tunnel Boring Machine (TBM\u2019s) arriving from the adjacent stations.<\/span><\/p>\n<\/div>

<\/div>
<\/div>

Project Information\u00a0<\/span><\/h2>\n<\/div>

Diaphragm Wall:<\/strong> perimeter: 646m; surface area: 25,644m2; depth: up to 48m; 1.0 & 1.2m thickness<\/span><\/p>\n

 <\/p>\n<\/div>

<\/div><\/div><\/div>

Owner:<\/span><\/p>\n

Land Transport Authority<\/span><\/h3>\n<\/div>
<\/div>
<\/div><\/div>
<\/div>

Engineer:<\/span><\/p>\n

Parsons Brinkerhoff Pte Ltd<\/span><\/h3>\n<\/div>
<\/div>
<\/div><\/div>
<\/div>

Main Contractor:<\/span><\/p>\n

Taisei Corporation<\/span><\/h3>\n<\/div>
<\/div>
<\/div><\/div>
<\/div>

Year:<\/span><\/p>\n

2005; 2006<\/span><\/strong><\/h3>\n<\/div>
<\/div><\/div><\/div><\/div><\/div>
<\/span><\/div><\/div><\/div><\/div><\/div>

Related projects<\/span><\/p><\/h2><\/div>

<\/div><\/div><\/div>
<\/i>All projects<\/span><\/a><\/div>
<\/div><\/div><\/div>