{"id":5986,"date":"2023-06-15T08:43:22","date_gmt":"2023-06-15T06:43:22","guid":{"rendered":"https:\/\/bachy-soletanche.com.sg\/?post_type=avada_portfolio&p=5986"},"modified":"2023-12-07T10:38:13","modified_gmt":"2023-12-07T09:38:13","slug":"braddell-road-underpass","status":"publish","type":"avada_portfolio","link":"https:\/\/bachy-soletanche.com.sg\/offer-portfolio\/braddell-road-underpass\/","title":{"rendered":"Braddell Road Underpass"},"content":{"rendered":"
The project consists of the upgrading of the Central Expressway and Braddell Road Interchange, principally by the provision of an underpass to ease the traffic flow along Braddell Road.<\/span><\/p>\n<\/div> The diaphragm wall will consist of two 1.2m thickness walls on both sides and a 1.0m thick central wall. A total of 9,000m2 of concrete diaphragm wall is envisaged.<\/p>\n<\/div> Client:<\/span><\/p>\n Engineer:<\/span><\/p>\n Main Contractor:<\/span><\/p>\n Year:<\/span><\/p>\n Related projects<\/span><\/p><\/h2><\/div>Project Information<\/span><\/h2>\n<\/div>
Land Transport Authority<\/span>\u00a0<\/span><\/h3>\n<\/div>
Land Transport Authority<\/span>\u00a0<\/span><\/h3>\n<\/div>
Econ Piling Pte Ltd<\/span><\/h3>\n<\/div>
2000; 2001<\/span><\/strong><\/h3>\n<\/div>