{"id":6081,"date":"2023-06-19T06:13:02","date_gmt":"2023-06-19T04:13:02","guid":{"rendered":"https:\/\/bachy-soletanche.com.sg\/?post_type=avada_portfolio&p=6081"},"modified":"2023-12-01T04:26:35","modified_gmt":"2023-12-01T03:26:35","slug":"shenton-way-station","status":"publish","type":"avada_portfolio","link":"https:\/\/bachy-soletanche.com.sg\/offer-portfolio\/shenton-way-station\/","title":{"rendered":"T225 Shenton Way Station"},"content":{"rendered":"
As part of the realization of the contract T225 for the construction of the new metro line in Singapore, Bessac<\/a> completed a pipe-roof using a slurry micro tunneling machine in order to protect an existing metro tunnel during the construction of the new one.<\/span><\/p>\n<\/div> The pipe roof consists of up to 6 drives, 53m long each in order to from a vault. A total of 318m is excavated using micro tunneling. This vault has a minimal cover of only 1.35m with the existing metro line remained in service during the works.\u00a0<\/span><\/p>\nProject Information<\/span><\/h2>\n<\/div>