{"id":6094,"date":"2023-06-19T08:26:10","date_gmt":"2023-06-19T06:26:10","guid":{"rendered":"https:\/\/bachy-soletanche.com.sg\/?post_type=avada_portfolio&p=6094"},"modified":"2023-12-08T03:16:39","modified_gmt":"2023-12-08T02:16:39","slug":"t302-thomson-east-coast-line","status":"publish","type":"avada_portfolio","link":"https:\/\/bachy-soletanche.com.sg\/offer-portfolio\/t302-thomson-east-coast-line\/","title":{"rendered":"T302 Founders\u2019 Memorial Station"},"content":{"rendered":"

We Build the Foundation of Smart Cities<\/span><\/h1>\n<\/div>
<\/div><\/div><\/div><\/div><\/div><\/div>\n

T302 Founders\u2019 Memorial Station<\/span><\/h2>\n<\/div><\/div><\/div><\/div><\/div>

Project Description<\/span><\/h2>\n<\/div>

Project T302 Founders\u2019 Memorial Station\u00a0is <\/span>located<\/span> along <\/span>Rhu<\/span> Cross Road and Marina East Drive and <\/span>adjacent to<\/span> the Marina Golf Course<\/span> and Garden by the Bay East<\/span>. <\/span>The main contract consists of <\/span>3 <\/span>basement construction <\/span>for the<\/span> facility building and 4 bored tunnels running from Marina East Drive to <\/span>Tanjong<\/span> Rhu<\/span>. Our role is to construct the Diaphragm wall, Crosswall, Bored piles & Ground improvement.<\/span><\/span><\/p>\n<\/div>

<\/div>

Project Information\u00a0<\/span><\/h2>\n<\/div>

Bachy Soletanche Singapore scope of work consists of constructing 1200mm and 1500mm thick diaphragm wall.<\/span> The <\/span>footprint of the <\/span>buil<\/span>ding is approximately 185m long by<\/span> 45m wide <\/span>by<\/span> 20m deep. <\/span>As the worksite is situated at the<\/span> historic <\/span>reclaimed land<\/span> of Singapore<\/span>, thick marine clay layer with <\/span>F<\/span>2<\/span> geotechnical<\/span> soil profile is expected to <\/span>encounter<\/span> during the course of<\/span> excavation.<\/span> Our diaphragm wall<\/span> toe level<\/span> is to socket in <\/span>OA(<\/span>A<\/span>)<\/span> and it<\/span> fall<\/span>s<\/span> between 55m to 65m deep.<\/span><\/span><\/p>\n<\/div>

<\/div><\/div><\/div>

Client:<\/span><\/p>\n

Land Transport Authority\u00a0<\/span><\/h3>\n<\/div>
<\/div>
<\/div><\/div>
<\/div>

Engineer:<\/span><\/p>\n

Mott Macdonald<\/span><\/h3>\n<\/div>
<\/div>
<\/div><\/div>
<\/div>

Main Contractor:<\/span><\/p>\n

China Railway First<\/span>\u00a0Group<\/span><\/h3>\n<\/div>
<\/div>
<\/div><\/div>
<\/div>

Year:<\/span><\/p>\n

2017<\/span><\/strong><\/h3>\n<\/div>
<\/div><\/div><\/div><\/div><\/div>
\"T302<\/span><\/div><\/div><\/div><\/div><\/div>

Related projects<\/span><\/p><\/h2><\/div>

<\/div><\/div><\/div>
<\/i>All projects<\/span><\/a><\/div>
<\/div><\/div><\/div>