{"id":6110,"date":"2023-06-19T09:40:28","date_gmt":"2023-06-19T07:40:28","guid":{"rendered":"https:\/\/bachy-soletanche.com.sg\/?post_type=avada_portfolio&p=6110"},"modified":"2024-03-12T11:03:21","modified_gmt":"2024-03-12T10:03:21","slug":"tuas-shipyard-raffles-dock","status":"publish","type":"avada_portfolio","link":"https:\/\/bachy-soletanche.com.sg\/offer-portfolio\/tuas-shipyard-raffles-dock\/","title":{"rendered":"Tuas Shipyard Raffles Dock"},"content":{"rendered":"
The project involves the construction of a 45m long extension to the existing Raffles Dry Dock facility at Keppel shipyards in Tuas consisting of 154m of 30m deep diaphragm walls with ground anchor tie backs.<\/p>\n<\/div>
1. Excavation and construction of 4,600m\u00b2 of Diaphragm Wall<\/p>\n
2. Installation of 50 ground anchors<\/p>\n
3. Excavation and disposal of 34,000m3 of spoil and demolition and disposal of existing headwall<\/p>\n
4. Construction of 2,800m\u00b2 base slab including drainage blanket<\/p>\n
5. Construction of 3.5m deep rebated services gallery as coping above D-Walls plus 45m extension of crane rails on driven H piles<\/p>\n
6. Demolition of 2m cantilevered gallery and construction of new rebated gallery along both edges of 355m dry dock plus 100m of quayside and mooring on sea side of gate<\/p>\n
7. Modifications to concrete structures at gate housing within limpet dam.<\/p>\n<\/div>
Client:<\/span><\/p>\n Engineer:<\/span><\/p>\n Main Contractor:<\/span><\/p>\n Year:<\/span><\/p>\n Related projects<\/span><\/p><\/h2><\/div>Keppel Shipyard Ptd<\/span><\/h3>\n<\/div>
Steen Consultants<\/span><\/h3>\n<\/div>
Antara Koh<\/span><\/h3>\n<\/div>
2012<\/span><\/h3>\n<\/div>