{"id":6209,"date":"2023-06-26T09:10:37","date_gmt":"2023-06-26T07:10:37","guid":{"rendered":"https:\/\/bachy-soletanche.com.sg\/?post_type=avada_portfolio&p=6209"},"modified":"2023-12-08T03:33:20","modified_gmt":"2023-12-08T02:33:20","slug":"c929a-ubi-and-tai-seng","status":"publish","type":"avada_portfolio","link":"https:\/\/bachy-soletanche.com.sg\/offer-portfolio\/c929a-ubi-and-tai-seng\/","title":{"rendered":"C929A Tunnel at Ubi & Tai Seng\u00a0"},"content":{"rendered":"
For contract C929A, the total length along cut and cover tunnel of Ubi Station towards Kaki Bukit Station, Tunnel Between Ubi Station and Kaki Bukit Station, tunnel connecting Ubi Station and Tai Seng Facility Building and tunnel connecting Bedok Town Park Station to Tai Seng Facility Building is about 4.9km.<\/p>\n<\/div>
Client:<\/span><\/p>\n Engineer:<\/span><\/p>\n Main Contractor:<\/span><\/p>\n Year:<\/span><\/p>\n Related projects<\/span><\/p><\/h2><\/div>Land Transport Authority\u00a0<\/span><\/h3>\n<\/div>
TY\u00a0Lin<\/span><\/h3>\n<\/div>
Nishimatsu Construction\u00a0Co Ltd<\/span><\/h3>\n<\/div>
2011; 2012<\/span><\/strong><\/h3>\n<\/div>