{"id":8549,"date":"2024-09-02T07:22:25","date_gmt":"2024-09-02T05:22:25","guid":{"rendered":"https:\/\/bachy-soletanche.com.sg\/?p=8549"},"modified":"2024-09-03T07:45:37","modified_gmt":"2024-09-03T05:45:37","slug":"bss-awarded-crl2-maju-station-diaphragm-wall","status":"publish","type":"post","link":"https:\/\/bachy-soletanche.com.sg\/bss-awarded-crl2-maju-station-diaphragm-wall\/","title":{"rendered":"Bachy Soletanche Singapore Awarded CRL2 Maju Station"},"content":{"rendered":"

<\/div>\n<\/div>
<\/div>

We are thrilled to announce that Bachy Soletanche Singapore has been awarded the subcontract the diaphragm wall for Cross Island Line Phase 2 (CRL2) – Maju Station. The future Maju MRT station will be located along Clementi Road near existing infrastructure such as busy major road and educational institutions.<\/p>\n

Additionally, this project will encounter two different ground conditions: Bukit Timah Granite and Jurong Formation. To tackle the hard rock, we will be deploying our Hydrofraise\u00ae equipped with gripper which is known for its powerful drilling capabilities. We will work with Land Transport Authority (LTA) to monitor the works closely to ensure that they will be carried out safely and with minimal impact to nearby stakeholders and existing structures.<\/p>\n<\/div>