In the begining ....
-
2010 C908 Telok Ayer, C903 Bugis, T219 Orchard, T228 Garden by the Bay Station as Main Contractor
C908 Telok Ayer, C903 Bugis, T219 Orchard, T228 Garden by the Bay Station as Main Contractor
T302 Founders’ Memorial Station, T212 Upper Thomson Station, T225 Shenton Way Station & C885 Prince Edward Station as Subcontractor
C929A Cut and Cover Tunnels at Ubi & Tai Seng
Tuas Shipyard Raffles Dock
Duo Residences
National Gallery Singapore
Sengkang General Hospital
-
2020’s N105, CR116 and T303 as Main Contractor
Pasir Ris 8
T303 Tanjong Rhu Station
CR106 Design and Constuction of Loyang Station
CR116 Ang Mo Kio Station & N105 as Main Contractor (Ongoing)
CR202 Design and Construction of Bored Tunnel (Ongoing)
P103 Design and Construction of Riviera Station (Ongoing)
CR206 Design and Constuction of Maju Station and Tunnel (Ongoing)
To be continued....