The Circle Line is a 33km extension to the Singapore mass transit system comprising 29 stations. Project C852 involves the construction of the station at Serangoon and the interconnecting bored tunnels to Lorong Chuan and Bartley Stations.

 

Project Information 

Diaphragm wall: length 363m; surface area: 14,020m2; depth: up to 55m; thickness: 1.0m

Barrette Piles: number: 44; surface area:8,283m2; depth; up to 62m; widths: 1000mm & 1200mm; length: 2.8m, 6m, 7m & 8.4m

3,600 tonne preliminary load test.

Client:

Land Transport Authority 

Engineer:

MWH

Main Contractor:

Woh Hup – STEC – Alpine JV

Year:

2003; 2004