Project Description

The New Downtown of Singapore is being built on reclaimed land in front of the existing Central Business District and poses several challenges in the design and construction of the basement and foundation systems. With a complex geology and a thick layer of very soft marine clays above the choice of foundation system becomes very important. Additionally old quay walls and various abandoned marine structures from Singapore’s rich maritime history complicate the construction of the underground works.

Project Information 

Diaphragm Wall: Perimeter – 220m; surface area – 6,532m2; depth – 29m; thickness – 0.8 & 1.0m

Barrette Piles: Surface area – 13,700m2; depth – up to 67m; sizes – 2800x1200mm & 2800x1000mm; all toe grouted; 1 preliminary & 2 working load tests up to 3,600 tonne

 

Owner:

City Developments Ltd/American International Group

Engineer:

Meinhardt Singapore Pte Ltd.

Main Contractor:

Dragages Singapore Pte Ltd.

Year:

2005