C854 Farrer Road Station
Project Description
The Circle Line is a 33km extension to the Singapore mass transit system comprising 29 stations. Contract C854 involves the construction of a station at Farrer Road and cut and cover tunnels including receiving shafts for Tunnel Boring Machine (TBM’s) arriving from the adjacent stations.
Project Information
Diaphragm Wall: perimeter: 646m; surface area: 25,644m2; depth: up to 48m; 1.0 & 1.2m thickness
Owner:
Land Transport Authority
Engineer:
Parsons Brinkerhoff Pte Ltd
Main Contractor:
Taisei Corporation
Year: