C854 Farrer Road Station

Project Description

The Circle Line is a 33km extension to the Singapore mass transit system comprising 29 stations. Contract C854 involves the construction of a station at Farrer Road and cut and cover tunnels including receiving shafts for Tunnel Boring Machine (TBM’s) arriving from the adjacent stations.

Project Information 

Diaphragm Wall: perimeter: 646m; surface area: 25,644m2; depth: up to 48m; 1.0 & 1.2m thickness

 

Owner:

Land Transport Authority

Engineer:

Parsons Brinkerhoff Pte Ltd

Main Contractor:

Taisei Corporation

Year:

2005; 2006