Project Description

We Build the Foundation of Smart Cities

Resort World Sentosa (RWS)

Project Description

Bachy Soletanche Singapore’s scope of work for this project involves the installation of prefabricated rebar cages and the construction of diaphragm walls and barrette piles. These works are carried out in connection with the proposed erection of a Part 16- and Part 17-storey hotel (700 rooms), a 4-storey retail and entertainment podium, the addition of a new waterfront attraction (free show), and additions and alterations to the existing boardwalk to facilitate the implementation of a driverless transport system, as well as additions and alterations to the existing basement zone at 8 Sentosa Gateway, within the Southern Islands Planning Area. The main contract works are awarded by Resorts World Sentosa Pte Ltd (RWS) to the main contractor.

Project Information 

1200mm thick – Diaphragm walls and T-Panels (103 Panels)

  • Excavation Volume – 12,620m3
  • Concrete Volume – 11,650m3
  • Average Excavation Depth – 28m
  • Average Rock Depth – 9m

1500mm thick – Barrette Piles (5 Panels – 8.4m/panel)

  • Excavation Volume – 2,440m3
  • Concrete Volume – 1,360m3
  • Average Excavation Depth – 39m
  • Average Rock Depth – 24.5m

Owner:

Resort World Sentosa (RWS)

Engineer:

RSP, AECOM & WSP

General Contractor:

MCC China Jingye Engineering Corporation Limited (Singapore Branch)

Year:

2025;2026

Related projects