Project Description

We Build the Foundation of Smart Cities

Toa Payoh Police Station

Project Description

BSS was engaged to carry out bored piling and diaphragm wall works for the construction of a 6-storey police building with two basement levels at Lot 10912V, Lorong 8 within the Toa Payoh Planning Area.

The scope involved the installation of bored piles to support the building structure and the construction of diaphragm walls to facilitate deep basement excavation and provide earth retention and groundwater control. The works were executed in a highly constrained urban environment and required careful coordination due to multiple live utilities that needed diversion by the main contractor, staged construction sequencing, and limited working space arising.

Project Information 

Bored piles = 93 nos. (incl. sister company Foundation Alliance)

Diameters = 800mm, 1200mm, 2,000mm, 2,500mm, mix of tension and compression piles

Average depth = 46.1m

Deepest pile = 58m

_________________________________________________________

Diaphragm wall panels = 318m in 71 panels

700mm-thick excavation = 3,961m3

800mm-thick excavation = 2,343m3

Average depth = 27.3m

Owner:

Singapore Police Force

Engineer:

Rankine & Hill

General Contractor:

Kim Seng Heng Engineering Construction (Pte) Ltd

Year:

2020-2021