Project Description
We Build the Foundation of Smart Cities
DSTA LCK Shaft
Project Description
Diaphragm Wall Works for the Lifting Shaft for Construction of Drains, Sewers, Water Pipelines and Ancillary Works at Lim Chu Kang.
The scope of works for Bachy Soletanche Singapore comprises the construction of ten (10) Diaphragm-wall panels forming a 20m internal diameter lifting shaft, as part of the construction of drains, sewers, water pipelines and associated ancillary works at Lim Chu Kang.
Project Information
Diaphragm wall : Approximately 67m length, comprising 1200mm thick D-wall extending to a depth of 39m.
Excavation: 3,134m3
Concrete: 3,037m3
Owner:
DSTA – Defence Science and Technology Agency
Design Engineer:
AECOM
Main Contractor:
KTC Civil Engineering & Construction Pte Ltd
Year:
2022